# USPE Vet Animal Positioning Tie-Down Option: Configuration Sign-Off

Drawing / model: `USPE-VET-TD`. Status: **UNSIGNED / NOT RELEASED FOR FABRICATION**.
This sheet records a proposed USPE configuration for review. It is not a completed engineering approval, an operating manual, a safety certification or an IP/legal clearance.

## Product and controlled artwork

- **Native product:** [USPE Vet Animal Positioning Tie-Down Option](https://www.mymortuarycooler.com/products/uspe-vet-animal-positioning-tie-down-option); record `gid://shopify/Product/15444325368110`.
- **Covered SKU(s):** `USPE-VET-TD-01`, `USPE-VET-TD-02`.
- **Image:** `uspe-own-vet-td.jpg`; SHA-256 `e6983e5fb9fac488ce5d4979830cf7afef03518a65d38e57336c00c130175cdb`.
- **Drawing:** `uspe-own-vet-td-signoff.jpg`; SHA-256 `383db7a52fb5697af142879ba92d59ab4c4324df6b6400777e5eb2f4f87160f4`.
- **Editable CAD:** `uspe-vet-td.step`; SHA-256 `ff320030af1c15631d758cd5d4f957296666fd222a987c04d377f68713b172dc`.

The illustration is an original CAD configuration view, not a photograph of a manufactured product. Purchased instruments, controls, electrical devices and plumbing components are proposed external layouts; their actual manufacturer, model, rating, fit and supply must be specified before release.

## Configuration to confirm

- Quantity: ____________________
- Quote / PO reference: ____________________
- Selected model / exact SKU: ____________________
- Materials / finish: ____________________
- Accessories / upgrades: ____________________
- Facility / delivery location: ____________________

Existing native selectors, not new promised capabilities:

- **Configuration request:** Rail and adjustable cleat review; Strap review.

## Proposed CAD envelope

| Drawing coordinate | Modeled overall span |
|---|---:|
| X across drawing | 900.0 mm |
| Y front-to-back | 67.0 mm |
| Z overall | 87.6 mm |

These values are measured from the proposed CAD, including modeled fixtures and overhangs. They are not verified production dimensions; do not substitute them for an approved shop drawing or assume the reference manufacturer’s ratings apply.

## Required reviews

- [ ] Confirm dimensions, working elevations, clearances and exact option interfaces.
- [ ] Fabricator confirms material grades, sections, gauges, welds, drain slopes and finish.
- [ ] Select actual purchased parts, approved BOM, supply and manufacturer documentation.
- [ ] Qualified reviewers address loads, stability, movement, restraints, electrical protection, plumbing/backflow and ventilation as applicable.
- [ ] Confirm image / CAD / quote revisions describe the same configuration.
- [ ] Obtain separate legal / patent / trade-dress and image-rights review where needed.

## Configuration acceptance

Name / organization: ____________________

Signature: ____________________    Date: ____________________

Accepted configuration and exceptions: ____________________

Configuration acceptance alone does not authorize fabrication or certify engineering, legal clearance, compatibility or regulatory compliance. Engineering approval: **not supplied**. IP/legal approval: **not supplied**.
