# USPE Fixed Pedestal Autopsy Table

USPE-AT-PF104. Specification and configuration review D2, October 29, 2026.

This is an unsigned design-review record, not a released operating manual or approved shop drawing. The illustrated configuration, native option records and unapproved technical fields must be reconciled before an order is released.

## Native product identity

- **Product ID:** 15446007415086
- **Handle:** uspe-fixed-pedestal-autopsy-table
- **Purchase route:** Equipment quote
- **Preservation:** Native IDs, SKUs, variant options and stored prices were not changed by this documentation update.

| Native SKU | Configuration request | Variant ID |
|---|---|---|
| USPE-AT-PF104-SS | Solid supports | 67868825092398 |
| USPE-AT-PF104-PS | Perforated supports | 67868825125166 |

## Current drawing references

- **Full product CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-at-pf104-hero-cad-d2-20261029.jpg?v=1793281079)
- **Component detail:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-at-pf104-detail-cad-d2-20261029.jpg?v=1793281079)
- **Front, side and top drawing:** [Open current reviewed image](https://www.mymortuarycooler.com/cdn/shop/t/401/assets/uspe-at-pf104-orthographic-visibility-review-20261029.jpg)

These are original CAD studies, not production photographs or engineering approval. Overall dimensions on the drawing describe the modeled assembly; source literals and native planning targets do not establish a certified installation envelope, operating range or capacity.

## Native listing scope

The following is the current native listing text, retained for reconciliation rather than independently certified here.

A fixed-pedestal table concept with a recessed work deck, removable body supports and an integrated sink zone.

Quote only · USPE-AT-PF104

Design-development listing. Proposed dimensions and original 3D studies require technical approval before production.

Base configuration and planning targets

Model
USPE-AT-PF104

Main deck target
104 x 32 in (2642 x 813 mm)

Deck-height target
35 in

Movement request
Fixed-height concept

Material request
304 stainless steel; No. 4 finish, subject to quote

Load / utilities / certifications
Not released; written model-specific approval required

Support layout, sink dimensions, access panels and all utility connections remain subject to an approved equipment drawing.

Build your equipment request

Select the layout, loading direction and separate accessories below. Book holders, grids, rinse, eyewash, disposal, rulers, ventilation and cart interfaces are requests, not automatically included or verified compatible.

Drawings and manual

Request model-specific drawings with your equipment quote. Any technical-review draft is not released operating or installation instructions.

Related planning

Compare autopsy tables · USPE options directory · Dissection book holder · Equipment quote request

## Planning fields and qualifications

- **Model:** USPE-AT-PF104
- **Main deck target:** 104 x 32 in (2642 x 813 mm)
- **Deck-height target:** 35 in
- **Movement request:** Fixed-height concept
- **Material request:** 304 stainless steel; No. 4 finish, subject to quote
- **Load / utilities / certifications:** Not released; written model-specific approval required

## Document status

USPE USPE-AT-PF104: specification and configuration review D2, dated October 29, 2026. Current main/detail CAD views and the geometry-derived study drawing are available for the illustrated configuration. They do not establish that every native option or handedness has separate approved geometry.

NOT FOR OPERATION, INSTALLATION OR FABRICATION. Do not use this document to connect utilities, lift or transfer a load, set a pressure, service a mechanism or establish a safe working load. No operating capacity or certification is established by this draft.

## Model and configuration

A fixed-pedestal table concept with a recessed work deck, removable body supports and an integrated sink zone.

Support layout, sink dimensions, access panels and all utility connections remain subject to an approved equipment drawing.

The render is an original modeled design study. It is not a photograph, as-built record or representation that a finished unit has been manufactured. Illustrated sink hardware, fasteners and controls are conceptual.

Record the selected orientation, loading direction and accessory quantities on the accepted quote. Left and right must be defined from the marked operator position on the approved plan, not from a photograph.

## Before release

Engineering must issue the model-specific overall and service-clearance drawing, bill of materials, supported load and load distribution, stability and restraint requirements, and signed configuration record.

For this fixed-height design, engineering must establish leveling or anchoring requirements, load retention and all service-access clearances. No anchoring pattern or stability rating is established here.

Approve the removable work surfaces, supports, drainage arrangement and accessory mounting interfaces before fabrication.

Issue verified electrical, water, waste, backflow and exhaust schedules for the actual supplied assembly. Confirm applicable standards with the facility team. This draft does not specify voltage, flow, pressure, exhaust volume or connection sizes.

## Receiving and installation record

Required record fields: purchase order, approved drawing revision, serial number, model and variant SKU, receiving date, shipping-damage record, installing contractor and facility contact.

The released instructions must identify lifting points, equipment mass, unpacking requirements, handling limitations, floor requirements and attachment details. These fields remain unapproved; do not infer them from the render.

Installation acceptance must be documented against the actual approved utility and equipment schedules. Required signatures: installer, facility representative and authorized equipment reviewer.

## Operation and maintenance sections awaiting approval

Operating procedure: RESERVED. Supply the validated pre-use checks, control identification, loading sequence, motion limits, transfer safeguards and shutdown instructions for the final assembly.

Cleaning and decontamination: RESERVED. Validate chemicals, concentrations, contact times, rinsing, drainage and disassembly against the actual materials, seals, bearings and electrical protection. This draft makes no disinfectant-compatibility claim.

Service and troubleshooting: RESERVED. Issue the actual isolation, residual-energy, inspection, repair and recommissioning procedures. Do not copy a hydraulic, electrical or maintenance procedure from another model.

Replacement parts: RESERVED. Approved part numbers, revisions, quantities and service instructions must match the shipped configuration. Do not substitute components based only on appearance.

## Release sign-off

Complete before issue: signed drawing; verified specifications and capacities; configuration-specific hazard assessment; validated instructions; utility schedule; component instructions and rights clearance; inspection record; service parts list; warranty terms approved by the seller.

Engineering reviewer: ____________________  Date: __________
Document revision: __________  Approved configuration: ____________________
Facility acceptance: ____________________  Date: __________

This draft does not provide a warranty, regulatory listing, country-of-origin declaration or permission to reproduce another manufacturer's proprietary material.

## Document control

Current review: D2, October 29, 2026. Earlier D0/D1 documents are historical review records and must not be treated as current instructions.

Engineering reviewer: ____________________  Date: __________

Approved configuration and drawing revision: ____________________

Facility acceptance: ____________________  Date: __________
