# USPE Stainless Autopsy Tray with Trough

USPE-AT-T8231. Specification and configuration review D2, October 29, 2026.

This is an unsigned design-review record, not a released operating manual or approved shop drawing. The illustrated configuration, native option records and unapproved technical fields must be reconciled before an order is released.

## Native product identity

- **Product ID:** 15446025306414
- **Handle:** uspe-stainless-autopsy-tray-with-trough
- **Purchase route:** Equipment quote
- **Preservation:** Native IDs, SKUs, variant options and stored prices were not changed by this documentation update.

| Native SKU | Configuration request | Variant ID |
|---|---|---|
| USPE-AT-T8231-D | With drain hole | 67868998631726 |
| USPE-AT-T8231-N | Without drain hole | 67868998664494 |

## Current drawing references

- **Full product CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-at-t8231-hero-cad-d2-20261029.jpg?v=1793282325)
- **Component detail:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-at-t8231-detail-cad-d2-20261029.jpg?v=1793282325)
- **Front, side and top drawing:** [Open current reviewed image](https://www.mymortuarycooler.com/cdn/shop/t/401/assets/uspe-at-t8231-orthographic-visibility-review-20261029.jpg)

These are original CAD studies, not production photographs or engineering approval. Overall dimensions on the drawing describe the modeled assembly; source literals and native planning targets do not establish a certified installation envelope, operating range or capacity.

## Native listing scope

The following is the current native listing text, retained for reconciliation rather than independently certified here.

A stainless autopsy tray with a raised central panel and surrounding trough. Choose a drain-hole or closed-trough configuration for the equipment quote.

Quote only | USPE-AT-T8231

Planning specifications

Model
USPE-AT-T8231

Planning envelope
82 x 31.25 x 1.75 in (L x W x H)

Material request
14-gauge 304 stainless steel; brushed finish request

Configuration
With drain hole, Without drain hole

Load rating
Not released; written approval required

Planning dimensions only. Approve the finished tray, support arrangement, drain position and interface before fabrication. No load rating or carrier compatibility is established.

Drawings and quote

Original modeled design studies show proposed geometry, not a photographed or approved production unit. Request the finished specification with your quote.

Request a USPE equipment quote

## Planning fields and qualifications

- **Model:** USPE-AT-T8231
- **Planning envelope:** 82 x 31.25 x 1.75 in (L x W x H)
- **Material request:** 14-gauge 304 stainless steel; brushed finish request
- **Configuration:** With drain hole, Without drain hole
- **Load rating:** Not released; written approval required

## Document status

USPE USPE-AT-T8231: specification and configuration review D2, dated October 29, 2026. Current main/detail CAD views and the geometry-derived study drawing are available for the illustrated configuration. They do not establish that every native option or handedness has separate approved geometry.

## Model and configuration

A stainless autopsy tray with a raised central panel and surrounding trough. Choose a drain-hole or closed-trough configuration for the equipment quote.

Planning dimensions only. Approve the finished tray, support arrangement, drain position and interface before fabrication. No load rating or carrier compatibility is established.

## Before release

Approve finished dimensions, material and edge construction, intended support method, validated load rating and handling procedure. Review drainage and equipment interfaces where applicable.

## Care and documentation

Issue validated cleaning and inspection instructions for the actual material assembly. No chemical, sterilization, imaging or equipment compatibility is established by this study.

## Quote record

Record model, drain choice if applicable, quantity, supporting equipment dimensions and facility requirements.

## Document control

Current review: D2, October 29, 2026. Earlier D0/D1 documents are historical review records and must not be treated as current instructions.

Engineering reviewer: ____________________  Date: __________

Approved configuration and drawing revision: ____________________

Facility acceptance: ____________________  Date: __________
