# USPE Elevating Decontamination Sink

USPE-DC-E. Specification and configuration review D2, October 29, 2026.

This is an unsigned design-review record, not a released operating manual or approved shop drawing. The illustrated configuration, native option records and unapproved technical fields must be reconciled before an order is released.

## Native product identity

- **Product ID:** 15446030909742
- **Handle:** uspe-elevating-decontamination-sink
- **Purchase route:** Equipment quote
- **Preservation:** Native IDs, SKUs, variant options and stored prices were not changed by this documentation update.

| Native SKU | Configuration request | Variant ID |
|---|---|---|
| USPE-DC-E-01 | Single bowl | 67869043065134 |
| USPE-DC-E-02 | Double bowl | 67869043097902 |
| USPE-DC-E-03 | Triple bowl | 67869043130670 |

## Current drawing references

- **Full product CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-elevating-decontamination-sink-hero-cad-d1.jpg?v=1793279544)
- **Component detail:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-elevating-decontamination-sink-detail-cad-d1.jpg?v=1793279544)
- **Rear CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-elevating-decontamination-sink-rear-cad-d1.jpg?v=1793279545)
- **Nominal deck plan:** [Open current reviewed image](https://www.mymortuarycooler.com/cdn/shop/t/401/assets/uspe-dc-e-orthographic-visibility-review-20261029.jpg)

These are original CAD studies, not production photographs or engineering approval. Overall dimensions on the drawing describe the modeled assembly; source literals and native planning targets do not establish a certified installation envelope, operating range or capacity.

## Native listing scope

The following is the current native listing text, retained for reconciliation rather than independently certified here.

A height-adjustable decontamination sink family for a project-specific washing workflow. Request one, two or three bowls, with the basin sequence, drainboard space and service access arranged around the equipment being processed.

Model USPE-DC-E. Quote only; final dimensions and included components are confirmed in the accepted project submittal.

Configuration details

Bowl-layout requests
Single, double or triple bowl

Working-height planning target
34–44 in; final mechanism and travel require approval

Basin-depth planning target
10 in; confirm against the selected instruments

Control-layout proposal
Recessed front-left panel beneath the drainboard

Options for your quote

Request manual or foot-operated mixing faucets, a spray hose, basin graduation markings, selected water-service outlets or a separately specified disposer. Single- and double-bowl lengths are project-sized; the triple-bowl reference envelope is 120 x 26 inches, not a universal size.

Installation coordination

Approve the independent USPE cabinet and lift design, protected control placement, electrical system, pinch-point protection and flexible supply/waste routing throughout travel. Sink selection does not validate a cleaning or disinfection process.

Planning dimensions are not fabrication-release specifications. No certification, capacity, country of origin or delivery date is asserted without model-specific documentation.

Request an equipment quote · Send an RFQ or purchase order for review

## Planning fields and qualifications

- **Model:** USPE-DC-E
- **Bowl-layout requests:** Single, double or triple bowl
- **Working-height planning target:** 34–44 in; final mechanism and travel require approval
- **Basin-depth planning target:** 10 in; confirm against the selected instruments
- **Control-layout proposal:** Recessed front-left panel beneath the drainboard

## Document status

USPE USPE-DC-E: specification and configuration review D2, dated October 29, 2026. Current main/detail CAD views and the geometry-derived study drawing are available for the illustrated configuration. They do not establish that every native option or handedness has separate approved geometry.

Do not connect utilities, move equipment under load, establish a load limit or perform service using this draft. Released instructions must match the accepted configuration and shipped serial number.

## Configuration and scope

A height-adjustable decontamination sink family for a project-specific washing workflow. Request one, two or three bowls, with the basin sequence, drainboard space and service access arranged around the equipment being processed.

Approve the independent USPE cabinet and lift design, protected control placement, electrical system, pinch-point protection and flexible supply/waste routing throughout travel. Sink selection does not validate a cleaning or disinfection process.

Request manual or foot-operated mixing faucets, a spray hose, basin graduation markings, selected water-service outlets or a separately specified disposer. Single- and double-bowl lengths are project-sized; the triple-bowl reference envelope is 120 x 26 inches, not a universal size.

The front-left recessed elevation control is a design-development proposal. Reach, splash exposure, motion guarding, inadvertent activation and full-travel service routing require validation.

## Before fabrication or installation

Obtain an approved overall drawing, actual basin or platform dimensions, service clearances, equipment mass, support and anchorage requirements, component schedule and accepted configuration record.

Confirm basin count and dimensions, installed rim height, water and waste locations, fixture and backflow requirements, mounting structure and selected electrical equipment. An illustration does not establish a load rating.

Powered motion, disposers and weighing systems require approved component documentation and integration review. Do not infer voltage, motor rating, pressure, flow, accuracy or safety protections from an image.

## Instructions awaiting validation

Operation: supply model-specific pre-use checks, control functions, loading or workflow sequence, travel limits, safeguards and shutdown procedures with the released equipment.

Cleaning: validate chemicals, concentrations, contact times, rinsing and disassembly against the actual materials, seals and electrical protection. This draft makes no disinfectant-compatibility or validated-process claim.

Service: issue the actual isolation, residual-energy, inspection, troubleshooting, replacement-part and recommissioning procedures. Do not borrow procedures from a visually similar product.

## Receiving and release record

Record the purchase order, model, native variant SKU, serial number, approved drawing revision, receiving inspection, installer and facility contact.

Before release, obtain signed drawings, verified specifications, configuration-specific hazard review, utility schedules, validated instructions, documented inspection and approved warranty terms.

Engineering reviewer: ____________________  Date: __________
Approved configuration: ____________________  Drawing revision: __________
Facility acceptance: ____________________

This draft provides no certification, country-of-origin declaration, availability promise or clearance to reproduce third-party material.

## Document control

Current review: D2, October 29, 2026. Earlier D0/D1 documents are historical review records and must not be treated as current instructions.

Engineering reviewer: ____________________  Date: __________

Approved configuration and drawing revision: ____________________

Facility acceptance: ____________________  Date: __________