# USPE Double Wall-Mounted Dissection Table Docking Station

USPE-DS-WD96. Specification and configuration review D2, October 29, 2026.

This is an unsigned design-review record, not a released operating manual or approved shop drawing. The illustrated configuration, native option records and unapproved technical fields must be reconciled before an order is released.

## Native product identity

- **Product ID:** 15446019965230
- **Handle:** uspe-double-wall-mounted-dissection-table-docking-station
- **Purchase route:** Equipment quote
- **Preservation:** Native IDs, SKUs, variant options and stored prices were not changed by this documentation update.

| Native SKU | Configuration request | Variant ID |
|---|---|---|
| USPE-DS-WD96-01 | 304 stainless / Lever control / No disposer | 67868945088814 |
| USPE-DS-WD96-02 | 304 stainless / Lever control / 0.5 hp per sink request | 67868945121582 |
| USPE-DS-WD96-03 | 304 stainless / Lever control / 0.75 hp per sink request | 67868945154350 |
| USPE-DS-WD96-04 | 304 stainless / Lever control / 1 hp per sink request | 67868945187118 |
| USPE-DS-WD96-05 | 304 stainless / Hot/cold foot control / No disposer | 67868945219886 |
| USPE-DS-WD96-06 | 304 stainless / Hot/cold foot control / 0.5 hp per sink request | 67868945252654 |
| USPE-DS-WD96-07 | 304 stainless / Hot/cold foot control / 0.75 hp per sink request | 67868945285422 |
| USPE-DS-WD96-08 | 304 stainless / Hot/cold foot control / 1 hp per sink request | 67868945318190 |
| USPE-DS-WD96-09 | 316 stainless / Lever control / No disposer | 67868945350958 |
| USPE-DS-WD96-10 | 316 stainless / Lever control / 0.5 hp per sink request | 67868945383726 |
| USPE-DS-WD96-11 | 316 stainless / Lever control / 0.75 hp per sink request | 67868945416494 |
| USPE-DS-WD96-12 | 316 stainless / Lever control / 1 hp per sink request | 67868945449262 |
| USPE-DS-WD96-13 | 316 stainless / Hot/cold foot control / No disposer | 67868945482030 |
| USPE-DS-WD96-14 | 316 stainless / Hot/cold foot control / 0.5 hp per sink request | 67868945514798 |
| USPE-DS-WD96-15 | 316 stainless / Hot/cold foot control / 0.75 hp per sink request | 67868945547566 |
| USPE-DS-WD96-16 | 316 stainless / Hot/cold foot control / 1 hp per sink request | 67868945580334 |

## Current drawing references

- **Full product CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-ds-wd96-hero-cad-d2-20261029.jpg?v=1793284435)
- **Component detail:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-ds-wd96-detail-cad-d2-20261029.jpg?v=1793284435)
- **Front, side and top drawing:** [Open current reviewed image](https://www.mymortuarycooler.com/cdn/shop/t/401/assets/uspe-ds-wd96-orthographic-visibility-review-20261029.jpg)

These are original CAD studies, not production photographs or engineering approval. Overall dimensions on the drawing describe the modeled assembly; source literals and native planning targets do not establish a certified installation envelope, operating range or capacity.

## Native listing scope

The following is the current native listing text, retained for reconciliation rather than independently certified here.

An original USPE dual-bay wall-station concept with two separated sink and service zones, two forward-facing table interfaces and a shared rear service spine. Select matching or different dissection-table models to build the package quote.

Quote only · USPE-DS-WD96

Design-development listing. Configuration details require model-specific approval before production.

Planning targets

Model
USPE-DS-WD96

Planning deck envelope
96 x 30 in (2438 x 762 mm)

Deck-height target
36 in

Configuration request
Wall-supported dual-bay service concept

Material request
304 or 316 stainless steel

Disposer request
None, 0.5 hp, 0.75 hp or 1 hp; final selection by quote

Drain-valve request
3/4-inch ball valve and hose connection; verify interface

Load / utilities / compliance
Not released; model-specific written approval required

The 96 x 30 x 36-inch envelope is a new USPE design target, not a specification inherited from another model. Each sink may be quoted with its own disposer and 0.75-inch drain valve. Wall loads, anchoring, service routing, exhaust balancing, access and each table interface require engineering approval. Original concept development does not establish patent clearance or market exclusivity.

Build the complete table package

Choose any listed USPE dissection-table model, its native variant and the quantity to include in the same equipment request. Tables are separate quote items. Selecting a model does not establish docking compatibility; each drain, exhaust and mechanical interface must be approved.

Station options

Request lever or hot/cold foot-operated faucet control, 304 or 316 stainless, a commercial disposer and a 3/4-inch drain ball valve. Disposer electrical supply, service clearances and plumbing are confirmed in the written quote.

Drawings and documentation

Request model-specific drawings with your equipment quote. Any technical-review draft is not approved for operation, installation or fabrication.

Dissection tables · Animal science equipment · USPE options · Request an equipment quote

## Planning fields and qualifications

- **Model:** USPE-DS-WD96
- **Planning deck envelope:** 96 x 30 in (2438 x 762 mm)
- **Deck-height target:** 36 in
- **Configuration request:** Wall-supported dual-bay service concept
- **Material request:** 304 or 316 stainless steel
- **Disposer request:** None, 0.5 hp, 0.75 hp or 1 hp; final selection by quote
- **Drain-valve request:** 3/4-inch ball valve and hose connection; verify interface
- **Load / utilities / compliance:** Not released; model-specific written approval required

## Document status

USPE USPE-DS-WD96: specification and configuration review D2, dated October 29, 2026. Current main/detail CAD views and the geometry-derived study drawing are available for the illustrated configuration. They do not establish that every native option or handedness has separate approved geometry.

NOT FOR OPERATION, INSTALLATION OR FABRICATION. Do not use this document to connect utilities, lift or transfer a load, set a pressure, service a mechanism or establish a safe working load. No operating capacity or certification is established by this draft.

## Model and configuration

An original USPE dual-bay wall-station concept with two separated sink and service zones, two forward-facing table interfaces and a shared rear service spine. Select matching or different dissection-table models to build the package quote.

The 96 x 30 x 36-inch envelope is a new USPE design target, not a specification inherited from another model. Each sink may be quoted with its own disposer and 0.75-inch drain valve. Wall loads, anchoring, service routing, exhaust balancing, access and each table interface require engineering approval. Original concept development does not establish patent clearance or market exclusivity.

The render is an original modeled design study. It is not a photograph, as-built record or representation that a finished unit has been manufactured. Illustrated sink hardware, fasteners and controls are conceptual.

Record the selected native model, variant, equipment quantities and optional accessories in the accepted quote. Each table-to-station connection needs its own approved interface drawing.

## Before release

Docking release: validate each selected table model independently. Approve interface elevations, restraint, drain slope, hose movement, duct geometry, exhaust balancing, service isolation and access. A dropdown selection is not a physical compatibility determination.

Wall-mount release: a qualified project engineer must approve the supporting wall, anchorage, bracket assembly, equipment mass, imposed loads and inspection requirements. This draft supplies no anchor schedule or allowable wall load.

Engineering must issue the model-specific overall and service-clearance drawing, bill of materials, supported load and load distribution, stability and restraint requirements, and signed configuration record.

For this fixed-height design, engineering must establish leveling or anchoring requirements, load retention and all service-access clearances. No anchoring pattern or stability rating is established here.

Approve the removable work surfaces, supports, drainage arrangement and accessory mounting interfaces before fabrication.

Issue verified electrical, water, waste, backflow and exhaust schedules for the actual supplied assembly. Confirm applicable standards with the facility team. This draft does not specify voltage, flow, pressure, exhaust volume or connection sizes.

## Receiving and installation record

Required record fields: purchase order, approved drawing revision, serial number, model and variant SKU, receiving date, shipping-damage record, installing contractor and facility contact.

The released instructions must identify lifting points, equipment mass, unpacking requirements, handling limitations, floor requirements and attachment details. These fields remain unapproved; do not infer them from the render.

Installation acceptance must be documented against the actual approved utility and equipment schedules. Required signatures: installer, facility representative and authorized equipment reviewer.

## Operation and maintenance sections awaiting approval

Operating procedure: RESERVED. Supply the validated pre-use checks, control identification, loading sequence, motion limits, transfer safeguards and shutdown instructions for the final assembly.

Cleaning and decontamination: RESERVED. Validate chemicals, concentrations, contact times, rinsing, drainage and disassembly against the actual materials, seals, bearings and electrical protection. This draft makes no disinfectant-compatibility claim.

Service and troubleshooting: RESERVED. Issue the actual isolation, residual-energy, inspection, repair and recommissioning procedures. Do not copy a hydraulic, electrical or maintenance procedure from another model.

Replacement parts: RESERVED. Approved part numbers, revisions, quantities and service instructions must match the shipped configuration. Do not substitute components based only on appearance.

## Release sign-off

Complete before issue: signed drawing; verified specifications and capacities; configuration-specific hazard assessment; validated instructions; utility schedule; component instructions and rights clearance; inspection record; service parts list; warranty terms approved by the seller.

Engineering reviewer: ____________________  Date: __________
Document revision: __________  Approved configuration: ____________________
Facility acceptance: ____________________  Date: __________

This draft does not provide a warranty, regulatory listing, country-of-origin declaration or permission to reproduce another manufacturer's proprietary material.

## Document control

Current review: D2, October 29, 2026. Earlier D0/D1 documents are historical review records and must not be treated as current instructions.

Engineering reviewer: ____________________  Date: __________

Approved configuration and drawing revision: ____________________

Facility acceptance: ____________________  Date: __________