# USPE Double-Drainboard Stainless Steel Scullery Sink

USPE-SC-2D. Specification and configuration review D2, October 29, 2026.

This is an unsigned design-review record, not a released operating manual or approved shop drawing. The illustrated configuration, native option records and unapproved technical fields must be reconciled before an order is released.

## Native product identity

- **Product ID:** 15446030844206
- **Handle:** uspe-double-drainboard-stainless-steel-scullery-sink
- **Purchase route:** Equipment quote
- **Preservation:** Native IDs, SKUs, variant options and stored prices were not changed by this documentation update.

| Native SKU | Configuration request | Variant ID |
|---|---|---|
| USPE-SC-2D-01 | 54 x 22 in / 18-in bowl | 67869042639150 |
| USPE-SC-2D-02 | 78 x 25 in / 30-in bowl | 67869042671918 |
| USPE-SC-2D-03 | 84 x 25 in / 36-in bowl | 67869042704686 |
| USPE-SC-2D-04 | 72 x 28 in / 24-in bowl | 67869042737454 |
| USPE-SC-2D-05 | 78 x 28 in / 30-in bowl | 67869042770222 |
| USPE-SC-2D-06 | 84 x 28 in / 36-in bowl | 67869042802990 |
| USPE-SC-2D-07 | 90 x 28 in / 42-in bowl | 67869042835758 |
| USPE-SC-2D-08 | 96 x 28 in / 48-in bowl | 67869042868526 |
| USPE-SC-2D-09 | 108 x 28 in / 60-in bowl | 67869042901294 |

## Current drawing references

- **Full product CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-double-drainboard-stainless-steel-scullery-sink-hero-cad-d1.jpg?v=1793279541)
- **Component detail:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-double-drainboard-stainless-steel-scullery-sink-detail-cad-d1.jpg?v=1793279541)
- **Rear CAD view:** [Open current reviewed image](https://cdn.shopify.com/s/files/1/1745/7501/files/uspe-double-drainboard-stainless-steel-scullery-sink-rear-cad-d1.jpg?v=1793279542)
- **Nominal deck plan:** [Open current reviewed image](https://www.mymortuarycooler.com/cdn/shop/t/401/assets/uspe-sc-2d-orthographic-visibility-review-20261029.jpg)

These are original CAD studies, not production photographs or engineering approval. Overall dimensions on the drawing describe the modeled assembly; source literals and native planning targets do not establish a certified installation envelope, operating range or capacity.

## Native listing scope

The following is the current native listing text, retained for reconciliation rather than independently certified here.

A central wash basin with drainboards on both sides provides separate staging surfaces for laboratory utility work. The proposed open-leg configuration combines a rear splash panel with adjustable feet and access beneath the basin.

Model USPE-SC-2D. Quote only; final dimensions and included components are confirmed in the accepted project submittal.

Configuration details

Layout
Central bowl with left and right drainboards

Nominal overall sizes
54 x 22 to 108 x 28 in; select a size request

Reference basin depth
14 in

Reference working height
34 in; backsplash and installed height confirmed separately

Options for your quote

Request a manual or hands-free mixing faucet, spray hose and an optional 1/2, 3/4 or 1 hp disposer. An alternative divided-bowl layout requires a separate drawing rather than being assumed equivalent to the single-bowl configuration.

Installation coordination

Confirm internal bowl dimensions, drainage fall, drainboard support, overall depth and leg placement. Longer drainboards may need additional supports; the illustrated leg count must match the approved layout.

Planning dimensions are not fabrication-release specifications. No certification, capacity, country of origin or delivery date is asserted without model-specific documentation.

Request an equipment quote · Send an RFQ or purchase order for review

## Planning fields and qualifications

- **Model:** USPE-SC-2D
- **Layout:** Central bowl with left and right drainboards
- **Nominal overall sizes:** 54 x 22 to 108 x 28 in; select a size request
- **Reference basin depth:** 14 in
- **Reference working height:** 34 in; backsplash and installed height confirmed separately

## Document status

USPE USPE-SC-2D: specification and configuration review D2, dated October 29, 2026. Current main/detail CAD views and the geometry-derived study drawing are available for the illustrated configuration. They do not establish that every native option or handedness has separate approved geometry.

Do not connect utilities, move equipment under load, establish a load limit or perform service using this draft. Released instructions must match the accepted configuration and shipped serial number.

## Configuration and scope

A central wash basin with drainboards on both sides provides separate staging surfaces for laboratory utility work. The proposed open-leg configuration combines a rear splash panel with adjustable feet and access beneath the basin.

Confirm internal bowl dimensions, drainage fall, drainboard support, overall depth and leg placement. Longer drainboards may need additional supports; the illustrated leg count must match the approved layout.

Request a manual or hands-free mixing faucet, spray hose and an optional 1/2, 3/4 or 1 hp disposer. An alternative divided-bowl layout requires a separate drawing rather than being assumed equivalent to the single-bowl configuration.

## Before fabrication or installation

Obtain an approved overall drawing, actual basin or platform dimensions, service clearances, equipment mass, support and anchorage requirements, component schedule and accepted configuration record.

Confirm basin count and dimensions, installed rim height, water and waste locations, fixture and backflow requirements, mounting structure and selected electrical equipment. An illustration does not establish a load rating.

Powered motion, disposers and weighing systems require approved component documentation and integration review. Do not infer voltage, motor rating, pressure, flow, accuracy or safety protections from an image.

## Instructions awaiting validation

Operation: supply model-specific pre-use checks, control functions, loading or workflow sequence, travel limits, safeguards and shutdown procedures with the released equipment.

Cleaning: validate chemicals, concentrations, contact times, rinsing and disassembly against the actual materials, seals and electrical protection. This draft makes no disinfectant-compatibility or validated-process claim.

Service: issue the actual isolation, residual-energy, inspection, troubleshooting, replacement-part and recommissioning procedures. Do not borrow procedures from a visually similar product.

## Receiving and release record

Record the purchase order, model, native variant SKU, serial number, approved drawing revision, receiving inspection, installer and facility contact.

Before release, obtain signed drawings, verified specifications, configuration-specific hazard review, utility schedules, validated instructions, documented inspection and approved warranty terms.

Engineering reviewer: ____________________  Date: __________
Approved configuration: ____________________  Drawing revision: __________
Facility acceptance: ____________________

This draft provides no certification, country-of-origin declaration, availability promise or clearance to reproduce third-party material.

## Document control

Current review: D2, October 29, 2026. Earlier D0/D1 documents are historical review records and must not be treated as current instructions.

Engineering reviewer: ____________________  Date: __________

Approved configuration and drawing revision: ____________________

Facility acceptance: ____________________  Date: __________
