Formalin-safe anatomy lab planning: establish OSHA formaldehyde exposure control plan. Ventilation: 8-12 air changes per hour, all exhaust routed outdoors. Equipment: covered dissection tables with ventilation ports, electric immersion dip tanks, grossing stations. PPE: gloves, aprons, respiratory protection if needed. Training: all staff understand hazards, symptoms, emergency procedures. Waste management: hazardous waste disposal per EPA RCRA code U122 for formaldehyde. Storage: secondary containment for formalin at 110% of largest container capacity. Monitoring: air quality testing, exposure assessment, medical surveillance if action level reached.