USPE Double Scrub Station

USPE equipment

USPE Double Scrub Station

Model: USPE-SS2-STD

Quote only

Request a quote for your selected model and configuration.

Request a quote

Production lead time is model- and configuration-specific. Confirm the current schedule in your written quote before ordering.

1-888-792-9315
140 Kwick Way Lane, Building 7, Johnson City, TN 37615

Product details

USPE Double Scrub Station is supplied through the USPE quote-only equipment family. Review the model schedule, select your requested configuration and download the applicable drawing before requesting a coordinated equipment quote.

Configuration and model selection

USPE Double Scrub Station is a stainless steel handwashing station for a laboratory or clinical utility plan. Choose the required model or reference build and request an itemized written quotation. Exact dimensions, utility connections, installed clearances, accessory fit and scope are finalized in the approved project submittal.

Selection Documented reference
USPE-SS2-STD | Standard 63 L × 28 D × 36 H inches; 14-inch sink depth; 31 gallons
USPE-SS2-ADA | Accessible-layout reference 64 L × 23 D × 48 H inches; 11-inch sink depth; 29.75 gallons

Materials, features and services

Selection Documented reference
Material 304 stainless steel, polished No. 4 finish
Seams Heliarc-welded, ground and polished to adjoining surfaces
Water and drainage 0.5-inch hot and cold supply; 1.5-inch waste drain
Fixtures Thermostatically controlled gooseneck mixing faucet; backflow protection; service access panels
Soap dispenser Four AA batteries required for the specified battery-powered dispenser
Standard mounting note Published standard station body height is 36 inches; a 12-inch raised mounting produces a 48-inch installed height
Optional foot control Hot/cold foot valve is documented only for the standard reference, not the accessible-layout reference

The accessible-layout reference is not an automatic site-wide ADA compliance certification. Confirm approach, knee and toe clearances, control reach, installed height and local requirements on the approved layout.

Technical drawings for each configuration

  • Original USPE dimensional planning drawing in preparation. Request the current model document.
  • Original USPE dimensional planning drawing in preparation. Request the current model document.

The approved project submittal defines the accepted USPE dimensions, utilities and equipment scope. Planning drawings are not fabrication releases.

Facility planning and related equipment

For a hospital pathology service or medical examiner facility, coordinate the equipment with utilities, ventilation, delivery access and the actual task. For a university anatomy laboratory, review teaching access and accessory use separately. For funeral-home preparation rooms, confirm the preparation workflow and table/station interface instead of choosing from appearance alone.

Pathology laboratory planning · Medical examiner and morgue equipment · USPE laboratory casework planning · Ventilated tables and station coordination

Procurement, origin and standards documentation

Request model-specific procurement references, material details, country-of-origin substantiation and any required certification or test documentation with your RFQ. Stainless steel construction is not itself an NSF listing, UL listing or ADA compliance certificate. No blanket “100% American made,” NSF, UL or third-party certification claim is asserted without documentation for the selected configuration.

Procurement classification reference desk explains NAICS industry references, UNSPSC commodity or class references, HS/HTS review and Shopify / Google categories. Final customs and bid classifications require the exact selected goods and scope.

Request a quote, send an RFQ or submit a PO for review

Choose the configuration and quantity, add the equipment and options to your USPE quote request, then include your delivery ZIP, facility, exact utility requirements and relevant non-sensitive drawings. Optional accessories and custom work are quoted separately unless explicitly included in the accepted scope.

USPE quote basket and request form · RFQ / PO request · Email a PO or RFQ with attachments · Document library

Attach the PO or RFQ to your email before sending. A purchasing document is reviewed against the accepted written quote; submitting a request is not automatic order acceptance. Do not include patient information.