Compare TITAN stainless sink and flushing stations, AME wall-mounted service equipment and USPE quote-only options. Model prices, utilities and Johnson City, TN support.
AME, TITAN & USPE preparation-room equipment · Johnson City, TN
Embalming sinks and stations for the actual room layout
Compare stainless-steel sink stations, flushing stations, wall-mounted service equipment and quote-only USPE workstations. Start with the task and utility plan, then choose the exact model; a similar-looking station from another manufacturer is not proof of identical dimensions, included fittings or installation requirements.
Quote-only ventilated wall-mounted station. Confirm the offered center- or double-sink configuration and facility ventilation requirements in the formal quote.
Embalming stations and water-control systems: choose the functions you need
An embalming station brings selected sink, rinse, aspiration, utility or storage functions into the preparation-room workflow. A separate water-control unit is not a complete sink station, and neither item automatically includes the embalming table. Compare the exact equipment and its required building connections.
Start with the basin, mounting and approach
Identify the working approach, basin location and required wall or floor support before choosing the cabinet. Wall-mounted stations need a suitable support and rough-in plan. A center-basin or double-basin configuration must be specifically offered for the selected model; those words are not interchangeable with left- and right-hand room layouts.
Review the selected material and fittings
The TITAN 1036-ES embalming sink station lists a 14-gauge 304 stainless cabinet. Do not assume every sink or station has that same gauge, basin geometry or finish. Compare the exact configuration’s faucet, spray hose, aspirator, backflow protection, eyewash, receptacle and storage before ordering.
Separate utilities from included installation work
Have the appropriate trades review the model’s actual water supply, drainage, electrical, wall support and any ventilation connections. Required building pressure, flow, circuit and rough-in dimensions must come from that exact model’s documentation or written project review. A catalog product price is not a complete installed-project price.
Coordinate the table and station
Confirm the table’s working height, drain location, hose routing and approach clearance against the station. The AME-MHFET folding table and standard hydraulic table use different adjustment mechanisms. Packages specify their own table and station inclusions; visible accessories are not automatically included.
Water-control unit or full station?
The AME 1036-9WCU water-control unit has its own product and utility requirements. Review the current configuration and request clarification before treating it as a substitute for a sink, flushing station or ventilated workstation.
Mopec’s autopsy and embalming sink category includes several station families, and its 1036-25 wall-mount station page lists center- and double-sink options. Match the actual basin arrangement, mounting, gauge/material, fixtures, utilities and scope when comparing a quote. The model names, price basis and warranty are not assumed equivalent across brands.
Plan the preparation room, not just the sink
Keep supply and drain routing clear of the table and transfer path. Check the exact model’s working height, service access and utility documentation with your installer before committing to the room layout. No sink or station here is represented as certified for your particular site without the necessary review.
Explore equipment financing subject to lender approval and current terms. Freight and applicable taxes are calculated at checkout or confirmed in a formal quote; model pages control the selected configuration and purchase terms.
Catalog prices checked November 1, 2026. “From” prices are for the listed base configuration, not every pack or option. Review the product page for current pricing, availability and terms.
An option belongs to a specific equipment configuration.
Use the listed option name and native SKU in the request, then identify the equipment model, quantity and required placement. An option listing is a configuration request, not evidence that it fits every model or is engineering-approved for every application.
Listed construction
Use the selected model’s stated materials, dimensions and configuration. Request supporting documentation for any project-critical requirement.
Send the equipment model, quantity, required options and room constraints for a quote review. No payment or checkout is required to request a USPE project quote.
Project requirements such as testing, certifications, accessibility and installation approval must be supported for the selected model and application. General catalog copy is not a substitute for that documentation.